Central Railway develops locomotive engine that will work even in 12 inches of water and pull local and long-distance trains stranded on waterlogged tracks.

Train services disrupted.” The three words that strike fear through the hearts of Mumbaikars during the monsoon may soon be a thing of the past.

The Central Railway is ready to roll out a modified, “waterproof” locomotive engine that will be able to run even in 12 inches of water. Usually, just four inches of water can bring a locomotive engine to its knees and force the train to stay put until the tracks clear.

Categories:

Tags:

Comments are closed